Roadmap

Project roadmap

What is already documented, what is being measured now, and what is queued next. Every item links to the experiment, documentation or equipment it depends on. Planned items are listed because they are intended, not because they are finished.

Completed4

Continuous monitoring
Temperature, pH and conductivity logged around the clock.
CO₂ automation
Injection held against each morning's degassed baseline.
PAR mapping
Twenty underwater positions measured with an Apogee MQ-510.
Growth tracking
An hourly frame captured whenever the light is on.

In progress2

Dutch grow-in
Documenting the scape filling in from fresh aquasoil.
PAR optimization
Using the measured distribution to place plants and set fixture position.

Planned3

Solar RGB II comparison
Same tank, meter, positions and procedure for both fixtures.
Canopy PAR mapping
The same positions measured at canopy height as stems fill in.
Long-term coloration study
Tracking color against measured light over months, not days.

Related