Documentation

Future Evaluations

How an independent evaluation is run, and what a manufacturer can expect.

Planned

Purpose

To set expectations before any equipment changes hands: what will be measured, what will be published, and what is not on offer.

Background

The terms are set out in full on the Evaluation Policy page, which is the public-facing version of this document. In short: this project measures one aquarium under repeatable conditions, and accepting equipment does not influence what gets published about it.

Methodology

Method not written up yet.

Observations

Nothing established yet. Observations are added when there is something specific to report, not to fill the section.

Scope

  • See the Evaluation Policy for the full terms

This page is planned. It is listed so the intended shape of the reference is visible.

Related experiments

References

Manufacturer Collaboration · Experimental Methodology · Experiment 004 · Solar RGB versus Solar RGB II