How an independent evaluation is run, and what a manufacturer can expect.
To set expectations before any equipment changes hands: what will be measured, what will be published, and what is not on offer.
The terms are set out in full on the Evaluation Policy page, which is the public-facing version of this document. In short: this project measures one aquarium under repeatable conditions, and accepting equipment does not influence what gets published about it.
Method not written up yet.
Nothing established yet. Observations are added when there is something specific to report, not to fill the section.
This page is planned. It is listed so the intended shape of the reference is visible.
Manufacturer Collaboration · Experimental Methodology · Experiment 004 · Solar RGB versus Solar RGB II